OPERATIONAL BENEFITS
Shortly after the leak position was highlighted by the EnigmahyQ, the area was excavated and the leak located. It was later verified as a 4 litres/sec leak. This equates to wastage of 345,600 every 24 hours, costing £528.76 per day.