At the completion of the first month of operation of the pipeline, our partner, ZKCiT was congratulated on the system performance. It was then revealed that in January 2018, shortly after the pipeline had started transporting oil, that local temperatures of -43 OC had been recorded.
The customer was pleased that the TBOX RTU’s continued to operate, exceeding their stated operational limits. The TBox MS RTU solution at Second line of the China-Russia crude oil pipeline was delivered by our Channel Partner ZKCiT.